California's water projects

CVP vs SWP: California's two big water projects, explained

The CVP is the federal Central Valley Project, run by the Bureau of Reclamation and serving mostly Central Valley agriculture and wildlife refuges. The SWP is the State Water Project, run by California DWR and serving mostly Southern California cities. They share the same Delta, which is why Delta conditions constrain both.

Updated Sep 24, 2026

Cite

The Central Valley Project and the State Water Project are California's two great water-moving systems, and they are easy to confuse because they overlap physically. The short version: the CVP is federal and agricultural, the SWP is state and urban, and both pull water through the same Sacramento-San Joaquin Delta.

Who runs them and who they serve

The CVP is operated by the US Bureau of Reclamation, a federal agency, and it was built to water the Central Valley. Most of its supply goes to Valley agriculture, with major deliveries to wildlife refuges. The SWP is operated by the California Department of Water Resources, a state agency, and it leans urban. Its dominant customer is the Metropolitan Water District serving Southern California cities, with San Joaquin Valley farms taking a share.

The shared Delta is the catch

Both projects move water from the wetter north of the state to the drier south, and both do it by pulling supply through the Delta with big pumps near Tracy. That shared plumbing is the key constraint. When Delta conditions tighten, for fish protection, salinity or storm operations, both projects feel it at once, which is why a bad Delta year can pull both allocations down together.

Side by side

The two projects announce separately and on different calendars, so the live numbers rarely match.

Live data: CVP (federal) and SWP (state) allocations, live · Allocations
Contractor classAllocationAnnouncedEarlier announcements
CVP south-of-Delta agricultural28%Aug 11, 202625% (May 19, 2026), 20% (Mar 24, 2026), 15% (Feb 26, 2026)
CVP south-of-Delta M&I78%Aug 11, 202675% (May 19, 2026), 70% (Mar 24, 2026), 65% (Feb 26, 2026)
SWP statewide45%May 1, 202630% (Jan 1, 2026)
CVP American River M&I north of Delta Folsom100%Feb 26, 2026none
CVP Cross Valley Irrigation20%Mar 24, 202615% (Feb 26, 2026)
CVP Cross Valley M&I65%Feb 26, 2026none
CVP Eastside Water Service0%Feb 26, 2026none
CVP Friant Division Class 1100%Feb 26, 2026none
CVP Friant Division Class 20%Feb 26, 2026none
CVP In Delta Municipal and Industrial100%Mar 24, 2026100% (Feb 26, 2026)
CVP Municipal and Industrial north of Delta100%Feb 26, 2026none
CVP Sacramento River Irrigation north of Delta100%Feb 26, 2026none
CVP Sacramento River Settlement100%Feb 26, 2026none
CVP San Joaquin River Settlement and Exchange100%Feb 26, 2026none
CVP Wildlife Refuges Level 2100%Feb 26, 2026none
Klamath Project Clear Lake Reservoir100%Apr 6, 2026none
Klamath Project Gerber and Clear Lake Reservoirs100%Apr 6, 2026none
Klamath Project Gerber Reservoir100%Apr 6, 2026none
Klamath Project Upper Klamath Lake63%Apr 6, 2026none

The table above lists the current allocation for every contractor class. The two rows to compare are CVP south-of-Delta agricultural, a representative federal class, and SWP statewide. A quick reference for the rest:

  • Operator: CVP is federal (Reclamation). SWP is state (DWR).
  • Core customers: CVP is Valley ag plus refuges. SWP is Southern California cities plus some ag.
  • First announcement: CVP around late February. SWP around December 1.
  • Contract basis: CVP is a percent of contract volume by class. SWP is a percent of Table A amounts.

For the mechanics of each, see the CVP allocations guide and the SWP allocations guide.